|
Owner's Manual
MODELS 9050 and 9070
VEHICULAR SLIDE GATE OPERATOR
|
| USE THIS MANUAL WITH
THE FOLLOWING MODEL ONLY
TABLE OF CONTENTS
Model 9050-080 9070-080
With circuit board 4702-010
DoorKing, Inc. reserves the right to make changes in the products described
in this manual without notice and without obligation of DoorKing Inc. to
notify any persons of any such revisions or changes. Additionally, DoorKing
Inc. makes no representations or warranties with respect to this manual.
This manual is copyrighted, all rights reserved. No portion of this manual
may be copied, reproduced, translated, or reduced to any electronic medium
without prior written consent from DoorKing, Inc.
|
IMPORTANT NOTICES
Vehicular gate systems provide convenience to their users and limit
vehicular traffic onto your property. These systems can produce high levels
of force, therefore it is important that you are aware of possible hazards
associated with your gate operating system. These hazards may include pinch
points, entrapment, absence of controlled pedestrian access or traffic
backup.
Be sure that the installer has instructed you on the proper operation of the
gate and gate operator system. Be sure that the installer has trained you
about the basic functions of the reversing systems associated with your gate
operating system and how to test them. These include reversing loops,
inherent reversing system, and may include electric edges, photo electric
cells, or other external devices.
This Owner's Manual is your property. Keep it in a safe place for future
reference.
* The speed limit for vehicular traffic through the gate area is 5 MPH.
Install speed bumps and signs to keep vehicular traffic from speeding
through the gate area. Failure to adhere to posted speed limits can result
in damage to the gate, gate operator, and to the vehicle.
* Be sure that all residents are familiar with the proper use of the gate
and gate operator. Be sure that all residents are familiar with the possible
hazards associated with the gate system.
* Be sure that all warning signs are permanently installed on both sides of
the gate in an area where they are fully visible to traffic.
* It is your responsibility to periodically check all reversing devices. If
any of these devices are observed to function improperly, remove the
operator from service immediately and contact your installing or servicing
dealer.
* Follow the recommended maintenance schedule.
* Do not allow children to play in the area of the operator or to play with
any gate operating device.
* Be sure that all activating devices are installed a minimum distance of 10
feet away from the gate and gate operator, or in such a way that a person
cannot touch the gate or gate operator while using the activating device. If
activating devices are installed in violation of these restrictions,
immediately remove the gate operator from service and contact your
installing dealer.
* To remove the gate operator from service, operate the gate to the full
open position and then shut off power to the gate operator at the service
panel.
|
 |
|

|
INSTALL THE GATE OPERATOR ONLY WHEN:
* The operator is appropriate for the construction of the gate and usage
Class of the gate.
* All openings of a horizontal slide gate are guarded or screened from the
bottom of the gate to a minimum of 4 feet (1.2 m) above the ground to
prevent a 2-1/4 inch (57.15 mm) diameter sphere from passing through the
openings anywhere in the gate, and in that portion of the adjacent fence
that the gate covers in the open position.
|
 |
* All exposed pinch points are eliminated or
guarded.
* Guarding is provided for exposed rollers.
* This operator is intended for installation only on slide gates used to
control vehicular traffic. Pedestrians must be provided with a separate
access opening.
* The gate must be installed in a location so that sufficient clearance is
provided between the gate and adjacent structures when opening and closing
to reduce the risk of entrapment. Sliding gates should not open into public
access areas.
* The gate must be properly installed and work freely in both directions
prior to the installation of the gate operator. Do not over-tighten the
operator clutch to compensate for a damaged gate.
* Controls must be far enough from the gate so that the user is prevented f
rom coming in contact with the gate while operating the controls. Controls
intended to be used to reset an operator after 2 sequential activations of
the entrapment protection device or devices must be located in the
line-of-sight of the gate. Outdoor or easily accessible controls should have
a security feature to prevent unauthorized use.
* All warning signs and placards must be installed where visible in the area
of the gate.
|
|

|
PRIMARY ENTRAPMENT PROTECTION
This vehicular gate operator is equipped with an inherent (Type A)
entrapment sensing system. This system will sense an obstruction in both the
opening and closing gate cycles, and will cause the gate to reverse
direction should an obstruction be encountered. If the system detects a
second obstruction before reaching the full open or close limit after the
initial reversal, an alarm will activate and the operator will require a
reset before resuming normal operation. See Section 4 for more information.
SECONDARY ENTRAPMENT PROTECTION
Non-contact and contact sensors can be used individually or in combination
with each other to provide secondary entrapment protection.
For gate operators utilizing a non-contact sensor:
1 . See instructions in this manual on the placement of non-contact sensors.
2. Care should be exercised to reduce the risk of nuisance tripping, such as
when a vehicle trips the sensor while the gate is still moving, and
3. One or more non-contact sensors shall be located where the risk of
entrapment or obstruction exists, such as the perimeter reachable by a
moving gate or barrier
|
| |
For gate operators utilizing a contact
sensor:
1 . One or more contact sensors shall be located at the leading edge,
trailing edge, and post mounted both inside and outside of a vehicular
horizontal slide gate.
2. A hardwired contact sensor shall be located and its wiring arranged so
that the communication between the sensor and the gate operator is not
subjected to mechanical damage.
3. A wireless contact sensor such as one that transmits radio frequency (RF)
signals to the gate operator for entrapment protection functions shall be
located where the transmission of the signals are not obstructed or impeded
by building structures, natural landscaping or similar obstruction. A
wireless contact sensor shall function under the intended end-use
conditions.
|
| |
|

|
GLOSSARY
GATE - A moving barrier such as a swinging, sliding, raising, lowering,
rolling, or the like, barrier, that is a stand-alone passage barrier or is
that portion of a wall or fence system that controls entrance and/or egress
by persons or vehicles and completes the perimeter of a defined area.
VEHICULAR BARRIER (ARM) OPERATOR (OR SYSTEM) - An operator (or system) that
controls a cantilever type device (or system) consisting of a mechanical arm
or barrier that moves in a vertical arc, intended for vehicular traff ic
flow at entrances or exits to areas such as parking garages, lots or toll
areas.
VEHICULAR VERTICAL PIVOT-GATE OPERATOR (OR SYSTEM) - A vehicular gate
operator (or system) that controls a gate that moves in an arc in a vertical
plane that is intended for use for vehicular entrances or exits to a drive,
parking lot, or the like.
VEHICULAR HORIZONTAL SLIDE-GATE OPERATOR (OR SYSTEM) - A vehicular gate
operator (or system) that controls a gate which slides in a horizontal
direction that is intended for use for vehicular entrance or exit to a
drive, parking lot, or the like.
VEHICULAR SWING-GATE OPERATOR (OR SYSTEM) - A vehicular gate operator (or
system) that controls a gate which swings in an arc in a horizontal plane
that is intended for use for vehicular entrance or exit to a drive, parking
lot, or the like.
VEHICULAR VERTICAL LIFT-GATE OPERATOR (OR SYSTEM) - A vehicular gate
operator (or system) that controls a gate which moves in the vertical
direction and is intended for use for vehicular entrance or exit to a
drive, parking lot, or the like.
RESIDENTIAL VEHICULAR GATE OPERATOR-CLASS I - A vehicular gate operator (or
system) intended for use in a home of one-to four single family dwelling, or
garage or parking area associated therewith.
COMMERCIAL / GENERAL ACCESS VEHICULAR GATE OPERATOR-CLASS 11 - A vehicular
gate operator (or system) intended for use in a commercial location or
building such as a multi-family housing unit (five or more single family
units), hotels, garages, retail store, or other building servicing the
general public.
INDUSTRIAL / LIMITED ACCESS VEHICULAR GATE OPERATOR-CLASS III - A vehicular
gate operator (or system) intended for use in an industrial location or
building such as a factory or loading dock area or other locations not
intended to service the general public.
RESTRICTED ACCESS VEHICULAR GATE OPERATOR-CLASS IV - A vehicular gate
operator (or system) intended for use in a guarded industrial location or
building such as an airport security area or other restricted access
locations not servicing the general public, in which unauthorized access is
prevented via supervision by security personnel.
SYSTEM - In the context of these requirements, a system refers to a group of
interacting devices intended to perform a common function.
WIRED CONTROL - A control implemented in a form of fixed physical
interconnections between the control, the associated devices, and an
operator to perform predetermined functions in response to input signals.
WIRELESS CONTROL - A control implemented in means other than fixed physical
interconnections (such as radio waves or infrared beams) between the
control, the associated devices, and an operator to perform predetermined
functions in response to input signals.
INHERENT ENTRAPMENT SENSOR SYSTEM - An automatic sensor system which senses
entrapment of a solid object and is incorporated as a permanent and integral
part of the operator.
ENTRAPMENT - The condition when an object is caught or held in a position
that increases the risk of injury.
|
|

|
|
TABLE OF CONTENTS |
Chapter I - Installation
SECTION
1.1 Specifications
1.2 Mounting Positions
1.2.1 Adjusting Chain Idlers
1.3 Mounting Options
1.3.1 Pad Mount Operators
1.3.2 Post Mounted Operators
1.4 Front Mount Operator Installation
1.4.1 Pad Mounted Operators
1.4.2 Post Mounted Operators
1.5 Rear Mount Operator Installation
1.5.1 Pad Mounted Operators
1.5.2 Post Mounted operators
1.6 Center Mount Operator Installation
1.6.1 Post Mounted Operators
1.7 Chain Installation
1.7.1 Front Mount Operators - Pad Mounted
1.7.2 Front Mount Operators - Post Mounted
1.7.3 Rear Mount Operators - Pad and Post Mounted.
1.7.4 Center Mount operators - Post Mounted Only
1.8 Warning Sign Installation
Chapter 2 - Electrical / Wiring
SECTION
2.1 Conduits
2.2 High Voltage
2.3 Control Wiring
2.3.1 Standard Control Wiring
2.4 Secondary Entrapment Protection Device Wiring
2.4.1 Non-Contact Sensors
2.4.2 Contact Sensors
2.5 Loop Detector Wiring
2.6 Master / Slave Control Wiring
2.6.1 Standard Operators
2.6.2 Secondary Entrapment Device Wiring
2.7 Alarm Reset Switch
2.8 Main Terminal Identification and Description
2.9 Auxiliary Terminal Identification and Description
Chapter 3 - Adjustments
SECTION
3.1 Circuit Board Adjustments
3.2 Switch Settings
3.3 Automatic Limit Adjustment
3.4 Inherent Reverse Adjustment
3.4.1 Reverse Sensitivity Adjustment
3.4.2 Clutch Adjustment
Chapter 4 - Operating Information
SECTION
4.1 Power and Reset Switches
4.2 Shutdown Conditions
4.2.1 Soft Shutdown
4.2.2 Resetting A Soft Shutdown
4.2.3 Hard Shutdown
4.2.4 Resetting A Hard Shutdown
4.3 Manual / Emergency Gate Operation
4.3.1 Emergency Vehicle Access Conditions
4.3.2 Fail-Safe Release
4.3.3 Fail-Secure Release
Chapter 5 - Maintenance, Trouble Shooting and Accessories
SECTION
5.1 Maintenance
5.2 Trouble Shooting
5.3 Accessories
Wire Diagrams
115 VAC
Illustrated Parts Breakdown 9050
Illustrated Parts Breakdown 9070
|
|

|
INSTALLATION
Prior to beginning the installation of the slide gate operator, we suggest
that you become familiar with the instructions, illustrations, and wiring
guidelines in this manual. This will help insure that your installation is
performed in an efficient and professional manner.
The proper installation of the vehicular slide gate operator is an extremely
important and integral part of the overall access control system. Check all
local building ordinances and building codes prior to installing this
operator. Be sure your installation is in compliance with local codes.
|
| SECTION 1.1 -
SPECIFICATIONS |
| Class of Operation: |
Model 9050: Class I only, Model 9070: Class 1, 11 |
| Type of Gate: |
Vehicular Slide Gates Only |
| Horsepower: |
Model 9050: 1/3 tip, Model 9070: 1/2 hp |
| Voltage / Phase: |
115 VAC |
| Current: |
Model 9050: 4.3 Amps, Model 9070: 5.2 Amps |
| Max Gate Weight: |
Model 9050: 300 Lb., Mode! 9070: 500 Lb. |
| Max Gate Length: |
Model 9050: 16 Feet, Model 9070: 22 Feet |
| Cycles / Hr: |
Model 9050: 10, Model 9070: 30 |
| Speed: |
Approximately 1 Ft. / sec |
| Primary Entrapment Protection: |
Inherent entrapment sensing system (Type A) |
| Secondary Entrapment Protection: |
Provision for connection of a non-contact sensor (Type
131) and or
a contact sensor (Type B2 Secondary entrapment protection
devices not supplied with the operator. |
|
| |
|
 |
|

|
SECTION 1.2
MOUNTING POSITIONS
The models 9050 and 9070 operators can be mounted in any of the mounting
positions shown below. Each method has its own advantages.
|
| Front Mount |
Rear Mount |
Center Mount |
| Chain is attached across the gate and is visible when
the gate is closed. |
Chain is attached to rear of gate and is not visible
when gate is closed. |
Chain is attached to rear of gate and is not visible
when gate is closed. |
| Single chain is required. |
Double chain required. |
Double chain required. |
| Operator is up front. |
Operator is mounted back, away from traffic. |
Operator must be post mounted. |
| Requires the gate to be wider than the opening. |
Requires installation of an idler sprocket. |
Requires installation of two idler sprockets. |
|
|
 |
|
 |
|
 |
|

|
1.2.1
ADJUSTING CHAIN IDLERS
Once the mounting position has been determined, the chain idlers in the
operator must be adjusted to accommodate the mounting position chosen. Refer
to the figures below to adjust the chain idlers. NOTE: The idlers are
factory set for the front mounting position.
|
|
 |
FIGURE 1.2.1A
Use this idler configuration when the operator is in the front position and
is pad mounted.
Remove the two top chain knockouts from each side of the operator.
|
FIGURE 1.2.1B
Use this idler configuration when the operator is in the rear position and
is either pad or post mounted.
Remove both the upper and lower chain knockout from the side of the operator
that the chain will enter and exit the unit.
|
 |
|
 |
FIGURE 1.2.1C
Use this idler configuration when the operator is in the center position and
is post mounted, or when the operator is in the front position and is post
mounted.
Do not remove any chain knockouts. The chain will enter and exit the unit
from the bottom.
|
|

|
SECTION 1.3
MOUNTING OPTIONS
1.3.1
PAD MOUNTED OPERATORSPad mounting can be used when the operator
will be installed using either the front or rear mounting position. If the
operator is to be center mounted, the post mounting method must be used.
|
|
 |
1 . Construct a form for the mounting pad
according to the specifications shown in figure 1.3.1. Be sure to level the
top edge of the form and that the top of the form is a minimum of four (4)
inches above ground level.
We suggest that you contact the local building department to determine the
required depth of the pad since soil conditions and code requirements vary
from city to city.
2. Set conduits reinforcing bars and/or wire mesh if required. The number of
conduits is determined by the application requirements. We suggest using a
minimum of four (4) conduits.
1 . High voltage power lines
2 - Low voltage control lines
3 - Loop lead-in wires (open loop)
4 - Loop lead-in wires (reverse loops)
Set additional conduits as required for your application,
NOTE: If conduits are not set in the pad, they can be routed to a J box
where connections to the operator can be made after it is installed. There
are three (3) 1/2 inch knockouts and one (1) 3/4 inch knockout on each side
of the operator for this purpose.
NOTE: Be sure to contact the local building department regarding conduit
requirements since electrical codes can vary from city to city.
|
|
 |
3. Mix the concrete according to the
manufacturers instructions. Pour the mixture into the form and tamp. Level
and finish the surface after pouring is complete. Do not set anchor bolts in
the concrete.
Sleeve anchors should be used to secure the operator to the pad. This allows
greater flexibility in positioning the operator on the pad.
4. Allow the pad to cure for 48 hours before removing the forms or mounting
the operator.
|
|

|
1.3.2
POST MOUNTED OPERATORS
Post mounting can be used when the operator will be installed in any of the
three mounting positions, and must be used if the operator is to be center
mounted.
|
|
 |
1 . Post mounting the operator requires the use
of an operator base plate (P/N 2600-495) and two (2) 6 X 6 steel post (not
supplied) welded to the base plate as shown in figure 1.3.2A.
The length of the steel post and the depth of the pad are determined by soil
conditions and local code requirements.
We suggest that you contact the local building department to determine the
required depth of the pad since soil conditions and code requirements vary
from city to city.
2. After the posts have been welded to the base plate to form the mounting
plate assembly, construct a form for the assembly according to the
specifications in figure 1.3.2B.
3. Position the mounting plate assembly into the form. Be sure that the base
plate is a minimum of four (4) inches above ground level.
Set conduits, reinforcing bars and/or wire mesh if required. The number of
conduits is determined by the application requirements. We suggest using a
minimum of four (4) conduits.
|
|
 |
1 - High voltage power lines
2 - Low voltage control lines
3 - Loop lead-in wires (open loop)
4 - Loop lead-in wires (reverse loops)
Set additional conduits as required for your application.
NOTE: If conduits are not set in the pad, they can be routed to a J box
where -connections to the operator can be made after it is installed. There
are three (3) 1/2 inch knockouts and one (1) 3/4 inch knockout on each side
of the operator for this purpose.
NOTE: Be sure to contact the local building department regarding conduit
requirements since electrical codes can vary from city to city.
IMPORTANT!! Be sure that the mounting plate is level and parallel with the
gate.
4. Secure the mounting plate assembly in the form. Mix the concrete
according to the manufacturers instructions. Pour the mixture into the form
and tamp. Level and finish the surface after pouring is complete.
5. Allow the pad to cure for 48 hours before removing the forms or mounting
the operator.
|
|

|
SECTION 1.4
FRONT MOUNT OPERATOR INSTALLATION |
1.4.1
PAD MOUNTED OPERATORS
1 . Before mounting the operator to the pad, position the chain idlers as
shown in figure 1.4.1A.
2. Remove the chain knockouts on each side of the operator.
3. Position the operator on the pad so that there is a minimum clearance of
one (1) inch between the back of the operator and the gate.
IMPORTANT!! Be sure that the operator is parallel to the gate! (Fig. 1.4.1
B) Installing the operator in any other manner will cause excessive chain
noise, chain wear, and premature chain idler failure.
4. Mark the holes on the mounting pad. Use a concrete drill bit to drill the
mounting holes to the size and depth required for the anchors being used. We
recommend 3/8 x 3 sleeve anchors. Anchors are not supplied with the
operator.
5. After the mounting holes are drilled, clean them out and install the
sleeve anchors. Position the operator over the anchors and tighten.
|
 |
1.4.2
POST MOUNTED OPERATORS
1. Before mounting the operator to the pad, position the chain idlers as
shown in figure 1.4.2A.
2. Do not remove any chain knockouts from the operator when using this
method of installation. The chain will enter and exit the operator from the
bottom.
3. Position the operator on the mounting plate. If the mounting plate
assembly has been installed correctly, there should be a minimum clearance
of one (1) inch between the back of the operator and the gate, and the back
of the operator should be parallel with the gate. If these conditions do not
exist, make corrections now!
|
 |
IMPORTANT!! Be sure that the operator is
parallel to the gate! (Fig. 1.4.1 B) Installing the operator in any other
manner will cause excessive chain noise, chain wear, and premature chain
idler failure.
4. Secure the operator to the mounting plate assembly using six (6) 1/2-13 x
1 112 bolts (or equivalent),
lock washers and nuts (hardware is not supplied).
|
|
 |
|

|
SECTION 1.5
REAR MOUNT OPERATOR INSTALLATION
1.5.1
PAD MOUNTED OPERATORS
1 . Before mounting the operator to the pad, position the chain idlers as
shown in figure 1.5.1 A.
2. Remove the chain knockouts from the side of the operator where the chain
will enter and exit the unit.
3. Position the operator on the pad so that there is a minimum clearance of
one (1) inch between the back of the operator and the fence.
IMPORTANT!! Be sure that the operator is parallel to the gate! (Fig.
1.5.1 B )
Installing the operator in any other manner will cause excessive chain
noise, chain wear, and premature chain idler failure.
4. Mark the holes on the mounting pad. Use a concrete drill bit to drill the
mounting holes to the size and depth required for the anchors being used. We
recommend 3/8 x 3 sleeve anchors. Anchors are not supplied with the
operator.
5. After the mounting holes are drilled, clean them out and install the
sleeve anchors. Position the operator over the anchors and tighten.
|
1.5.2
POST MOUNTED OPERATORS
1 . Before mounting the operator to the pad, position the chain idlers as
shown in figure 1.5.1 A.
2. Remove the chain knockouts from the side of the operator where the chain
will enter and exit the unit.
3. Position the operator on the mounting plate. If the mounting plate
assembly has been installed correctly, there should be a minimum clearance
of one (1) inch between the back of the operator and the fence, and the back
of the operator should be parallel with the gate. If these conditions do not
exist, make corrections now!
IMPORTANT!! Be sure that the operator is parallel to the gate! (Fig.
1.5.1 B) Installing the operator in any other manner will cause excessive
chain noise, chain wear, and premature chain idler failure.
4. Secure the operator to the mounting plate assembly using six (6) 1/2-13 x
1 112 bolts (or equivalent.),
lock washers and nuts (hardware is not supplied).
|
|
 |
|

|
SECTION 1.6
CENTER MOUNT OPERATOR INSTALLATION
Center mounted operators must be post mounted. There is no pad mounting
method for this type of installation.
1.6.1
POST MOUNTED OPERATORS
1 . Before mounting the operator to the pad, position the chain idlers as
shown in figure 1.6.1 A.
2. Do not remove any chain knockouts from the operator when using this
method of installation. The chain will enter and exit the operator from the
bottom.
3. Position the operator on the mounting plate. If the mounting plate
assembly has been installed correctly, there should be a minimum clearance
of one (1) inch between the back of the operator and the gate, and the back
of the operator should be parallel with the gate. If
these conditions do not exist, make corrections now!
IMPORTANT!! Be sure that the operator is parallel to the gate!
(Fig.1.6.1B) Installing the operator in any other manner will cause
excessive chain noise, chain wear, and premature chain idler failure.
4. Secure the operator to the mounting plate assembly using six (6) 1/2-13 x
1 1/2 bolts (or equivalent),
lock washers and nuts (hardware is not supplied).
|
|
 |
|

|
|
SECTION 1.7
CHAIN INSTALLATION
1.7.1
FRONT MOUNT OPERATORS PAD MOUNTED
1 . Secure the chain brackets to each end of the gate so that the brackets
are level with the top chain knockouts in the operator housing. Brackets
should be attached to the inside of the frame so that the chain bolts, when
attached, do not protrude beyond the frame of the gate.
2. Route the chain through the gate operator: over the chain guide idlers
and under the drive sprocket (Figure 1.7.1C).
3. Slide each end of the chain through a chain stop (optional). Chain stops
are not required if the gate has physical stops.
4. Attach the chain to the chain bolts using the master links supplied, then
attach the chain bolts to the chain brackets using the hardware supplied
(figure 1.7. 1 A). Make any adjustments to the chain length at this time.
 |
|
 |
5. Adjust the chain bolts to tighten the chain.
The chain should sag no more than one (1) inch per 10 feet of travel.
Do not over tighten the chain.
IMPORTANT!! Be sure that the chain is parallel to the gate (figure
1.7.1B). Installing the chain in any other manner will cause excessive
noise, chain idler wear and chain stretching.
6. Manually open the gate to the full open position and secure the chain
stop (if installed) to the chain so that it is in contact with the operator
housing.
7. Manually close the gate to the full closed position and secure the chain
stop (if installed) to the chain so that it is in contact with the operator
housing. |
|
 |
|

|
1.7.2
FRONT MOUNT OPERATORS
POST MOUNT
1 . Secure the chain brackets to each end of the gate so that the brackets
are level with the bottom chain idler in the operator housing. Brackets
should be attached to the inside of the frame so that the chain bolts, when
attached, do not protrude beyond the frame of the gate.
2. Route the chain through the gate operator: under the chain guide idlers
and over the drive sprocket (Figure 1.7.2C).
3. Slide each end of the chain through a chain stop (optional). Chain stops
are not required if the gate has physical stops.
4. Attach the chain to the chain bolts using the master links supplied, then
attach the chain bolts to the chain brackets using the hardware supplied
(figure 1.7.2A). Make any adjustments to the chain length at this time.
|
|
 |
|
 |
5. Adjust the chain bolts to tighten the chain.
The chain should sag no more than one (1) inch per 10 feet of travel. Do not
over tighten the chain. IMPORTANT!! Be sure that the chain is parallel to
the gate (figure 1.7.2B). Installing the chain in any other manner will
cause excessive noise, chain idler wear and chain stretching.
6. Manually open the gate to the full open position and secure the chain
stop (if installed) to the chain so that it is in contact with the operator
housing.
7. Manually close the gate to the full closed position and secure the chain
stop (if installed) to the chain so that it is in contact with the operator
housing.
|
|
 |
|

|
1.7.3
REAR MOUNT OPERATORS PAD AND POST MOUNT
1 . Install an endless idler assembly (p/n 2600-818) at the gate opening
between the gate and fence (figure 1.7.3A & C). Note that the chain is
routed between the fence and the gate in this type of installation.
IMPORTANT!! Be sure that the idler assembly is securely attached to the
gate post, pilaster, etc.
2. Secure the chain brackets to the gate as shown in figure 1.7.3A. The
chain brackets should be attached to the gate frame so that they are
approximately one (1) inch apart.
3. Route the chain through the gate operator: over the chain guide idlers
and around the drive sprocket (Figure 1.7.2C), and around the idler
assembly.
4. Attach the chain to the chain bolts using the master links supplied, then
attach the chain bolts to the chain brackets using the hardware supplied
(figure 1.7.3A). Make any adjustments to the chain length at this time.
|
|
 |
|
 |
| |
5. Adjust the chain bolts to tighten the chain.
The chain should sag no more than one (1) inch per 10 feet of travel. Do not
over tighten the chain. IMPORTANT!! Be sure that the chain is parallel to
the gate (figure 11.7.3B). Installing the chain in any other manner will
cause excessive noise, chain idler wear and chain stretching.
6. Manually operate the gate to be sure that the chain is not binding and
that the gate operates easily.
|
|
 |
|

|
1.7.4
CENTER MOUNT OPERATORS POST MOUNT ONLY
1 . Install an endless idler assembly (p/n 2600-818) at each end of the gate
opening (figure 1.7.4A & D). Note that the gate travels between the fence
and the chain in this type of installation (figure 1.7.4B).
IMPORTANT!! I Be sure that the idler post/mount assembly is secure.
2. Secure the chain brackets to the gate as shown in figure 1.7.4A. The
chain brackets should be attached to the gate frame so that they are
approximately one (1) inch apart.
3. Route the chain through the gate operator: under the chain guide idlers
and over the drive sprocket (Figure 1.7.2D), and then around the two idler
assemblies.
4. Attach the chain to the chain bolts using the master links supplied, then
attach the chain bolts to the chain brackets using the hardware supplied
(figure 1.7.4A). Make any adjustments to the chain length at this time.
|
|
 |
 |
5. Adjust the chain bolts to tighten the chain.
The chain should sag no more than one (1) inch per 10 feet of travel. Do not
over tighten the chain. IMPORTANT!! Be sure that the chain is parallel to
the gate (figure 1.7.4C). Installing the chain in any other manner will
cause excessive noise, chain idler wear and chain stretching.
6. Manually operate the gate to be sure that the chain is not binding and
that the gate operates easily.
|
|
 |
 |
| |
|

|
SECTION 1.8 WARNING SIGN
INSTALLATION

This DoorKing slide gate operator is shipped with two warning signs. The
purpose of the warning signs is to alert uniformed persons, and to remind
persons familiar with the system, that a potential hazard may exist so that
appropriate action can be taken to avoid the hazard or to reduce exposure to
the hazard.
1 . Permanently install the supplied warning signs on each side of the gate
in locations so that the signs are visible by persons on both sides of the
gate.
2. Use appropriate hardware such as wood or metal screws (not supplied) to
install the warnings.
|
|

|
ELECTRICAL / WIRING
Before attempting to connect any wiring to the operator, be sure that the
circuit breaker in the electrical panel is in the OFF position. Permanent
wiring must be installed to the operator as required by local electrical
codes. it is recommended that such work be performed by a licensed
electrical contractor.
Since building codes vary from city to city, we highly recommend that you
check with your local building department prior to installing any permanent
wiring to be sure that all wiring to the operator (both high and low
voltage) complies with local code requirements.
THIS GATE OPERATOR MUST BE PROPERLY GROUNDED!!
SECTION 2.1 CONDUITS
|
|
 |
The conduit requirements shown in figure 2.1
are for a typical slide gate operator installation (the slave operator is
shown for those applications where a slave operator may be used). The
conduit requirements for your application may vary from this depending on
your specific needs.
Use only sweeps for conduit bends. Do not use 900 connectors as this will
make wire pulls very difficult and can cause damage to wire insulation.
We suggest that minimum 3/4 inch conduit be used.
Be sure that all conduits are installed in accordance with local codes.
|
|

|
SECTION 2.2 HIGH VOLTAGE
Use the chart below to determine high voltage wire size requirements. The
distance shown in the chart is measured in feet from the operator to the
power source. If power wiring is greater than the maximum distance shown, it
is recommended that a service feeder be installed. When large gauge wire is
used, a separate junction box must be installed for the operator connection.
The wire table is based on stranded copper wire. Wire run calculations are
based on a 110 VAC power source with a 3% voltage drop on the power line,
plus an additional 10% reduction in distance to allow for other losses in
the system.
|
| MODEL |
AMPS
|
WIRE SIZE |
| 12 AWG |
10 AWG |
8 AWG |
6 AWG |
| 9050 Single Unit |
4.3 |
200 |
325 |
510 |
820 |
| 9050 Master / Slave |
8.6 |
100 |
160 |
255 |
410 |
| 9070 Single Unit |
5.4 |
160 |
260 |
410 |
650 |
| 9070 Master / Slave |
10.8 |
80 |
130 |
205 |
325 |
|
| |
Route incoming high voltage power through
conduit and into the operator as shown in figure 2.2A.
Be sure wiring is installed in accordance with local codes. Be sure to color
code all wiring.
Connect the power wires to the high voltage terminal strip as shown in
figure 2.2B.
It is recommended that a surge suppressor be installed on the high voltage
power lines to help protect the operator and circuit board from surges and
power fluctuations. |
|

|
SECTION 2.3
CONTROL WIRING
Controls must be far enough from the gate so that the user is prevented from
coming in contact with the gate while operating the controls. Outdoor or
easily accessible controls should have a security feature to prevent
unauthorized use.
|
2.3.1
STANDARD CONTROL WIRING
Connect optional control devices to the operator terminal strip as shown in
figure 2.3.1. Be sure that all electrical connections are made in accordance
with local electrical codes. Use 18 AWG wire for all low voltage wiring,
maximum distance 3000 feet. Use a low voltage surge suppressor DoorKing P/N
1878-010 if low voltage wire runs exceed 1000 feet. All inputs to the
terminal strip must be NORMALLY OPEN.
Standard reversing input (term 6) only functions while the gate is in the
closing cycle and should not be used as an input for a secondary entrapment
protection device. See Section 2.4 for secondary entrapment protection
device wiring.
Do not Dower any devices from the circuit board other than a low voltage
radio receiver as shown in 2.3.
|
|
 |
|

|
SECTION 2.4
SECONDARY ENTRAPMENT PROTECTION DEVICE WIRING
Secondary entrapment protection devices must be installed to insure a safe
operating environment and to reduce the risk of entrapment. This operator
has inputs for non-contact sensors and contact sensors for both opening and
closing gate cycles. Secondary entrapment protection may be provided by a
combination of both type sensors. See Section 5.3 for a list of acceptable
secondary entrapment protection devices.
|
2.4.1
NON-CONTACT SENSORS
Disconnect power to the gate operator before installing the non-contact
sensors.
See figure 2.4.1 for suggested placement of sensors. (Diagram is for
illustration purposes only. Actual placement of sensors is dependent on the
installation requirements).
One or more non-contact sensors shall be located where the risk of
entrapment or obstruction exist, such as the perimeter reachable by a moving
gate or barrier.
Use only UL listed (or equivalent) non-contact sensors.
Connect the non-contact sensors as shown below to the auxiliary terminal
strip located on the 4702 control board. Note that the common for these
devices is connected to Main Terminal 12.
|
|
 |
|

|
2.4.2
CONTACT SENSORS
Disconnect power to the gate operator before installing the contact sensors.
Connect the contact sensors as shown below to the auxiliary terminal strip
located on the 4702 control board. Note that the common for these devices is
connected to Main Terminal 12.
Contact sensors must be located at the leading edge, trailing edge, and post
mounted both inside and outside of the vehicular sliding gate. Additional
contact sensors may be added for additional protection where an entrapment
zone may exist.
Hardwired contact sensors must be located and wiring arranged so that the
communication between the sensor and the gate operator is not subjected to
mechanical damage.
|
|
 |
|

|
SECTION 2.5
LOOP DETECTOR WIRING
Loop detector wiring is shown for DoorKing model 9406 Plug-in loop detector
only. If other loop detectors are used, refer to the control wiring diagram
on the preceding page.
Be sure that power is turned off prior to making any connections to the
terminal strip,
If other loop detectors are used, all inputs to the terminal strip are
NORMALLY OPEN.
Loop layout shown is for a typical slide gate application with two way
traffic or one way exit only traffic. For one way entry only traffic, the
open loop and loop detector are not used.
Reverse loops are wired in SERIES! See detail A.
Refer to the separate Loop Information Manual (available from DoorKing) for
instructions on installing loops or performed loops.
|
|
 |
|

|
SECTION 2.6
MASTER / SLAVE CONTROL WIRING
2.6.1
STANDARD OPERATORS
The interface wiring between the two operators requires three (3) 18 AWG
wires for control plus two (2) additional 18 AWG wires for secondary
entrapment protection device connection. Each operator must be connected to
it's own power source as described in section 2.2. IMPORTANT!! Plug-in loop
detectors cannot be used in master/ slave applications with these operators.
Use external detectors that have a normally open (N.O.) dry contact relay as
a signal device.
1 . Connect the master / slave wiring (terminals 8, 9, 12) as shown in
figure 2.8.1. Be sure that power to both operators is OFF.
2. Connect the common (C) and normally open (N.O.) relay contacts from the
OPEN loop detector to terminals 8 and 12.
4. Connect the radio receiver as shown in figure 2.3.1. Note that the relay
contact from the radio receiver connects to terminal 8.
5. Connect any other OPEN devices to terminals 8 and 12. Connect standard
external REVERSING devices to terminals 9 arid 12. See section 2.8.2 for
secondary entrapment protection device wiring for master / slave operators.
|
|
 |
|

|
2.6.2
SECONDARY ENTRAPMENT DEVICE INSTALLATION
AND WIRING FOR MASTER / SLAVE OPERATORS
Secondary entrapment protection for slide gate operators connected in a
master/ slave configuration will require three sets of photo-beams to insure
protection.
One photo-beam is directed across the roadway and connected to the CLOSE
photo-beam input on the auxiliary terminal strip of both the master and
slave operator. This photo-beam is active in the close direction only and
will not affect the movement of the gates while the gates are opening.
Two photo-beams are required to protect the open direction of the gates -
one for the master operator and one for the slave operator. These
photo-beams are connected to the OPEN photo-beam input on the auxiliary
terminal strip in their respective operator. These photo-beams are active in
the open direction only. If a beam is interrupted while the gate(s) are in
the open cycle, only the gate that is controlled by the interrupted beam
will stop, the other gate will continue in the open direction.
|
|
 |
|

|
SECTION 2.7 AUXILIARY
DEVICES
The gate operator is equipped with a reset switch that will silence the
entrapment alarm and return the operator to normal operation after a hard
shutdown occurs. An auxiliary reset button may be added provided that the
following condition is met.
1. The alarm reset button must be located in the line of sight of the gate.
2. Connect the alarm reset switch to Aux Terminal 5 and Main Terminal 12.
|
|
 |
|

|
SECTION 2.8
MAIN TERMINAL IDENTIFICATION AND DESCRIPTION
1. EARTH GROUND
2. 115 VAC NEUTRAL
3. 115 VAC HOT
4. MOTOR WINDING
5. MOTOR WINDING
6. SOLENOID LOCK POWER
7. 24 VAC RADIO POWER, 250 MA. MAXIMUM
8. FULL OPEN / CLOSE INPUT
When gate is closed, input will open gate to full position.
When gate is open and auto close timer is turned on, input will re-set and
hold timer.
When gate is open and auto close timer is turned off, input will close gate.
When gate is closing, input will reverse gate.
9. STANDARD REVERSE INPUT
When gate is fully closed or in the opening cycle, this input has no affect
on the gate operator.
When gate is open and auto close timer is turned ON, input will re-set and
hold timer.
When gate is open and auto close timer is turned OFF, input will prevent
gate from closing.
When gate is closing, input will reverse gate.
10. DRY RELAY CONTACT
Operation of relay is dependent on setting of switch 3.
When switch 3 is OFF, relay activates when gate is in the full open
position.
When switch 3 is ON, relay is activated when gate is not closed.
Relay contacts can be set for Normally Open (NO) or Normally Closed (NC)
operation. Contact rating is 1 amp maximum at 24 Volts.
11. DRY RELAY CONTACT
12. LOW VOLTAGE COMMON
|
|

|
SECTION 2.9
AUXILIARY TERMINAL IDENTIFICATION AND DESCRIPTION
The auxiliary terminal is located on the 4702 circuit board just to the
right of main terminals 4 and 5. Auxiliary terminals are numbered 1 through
5 with the first terminal at the top.
1. OPEN PHOTO-BEAM
This input is only active when the gate is in the opening cycle. An open
photo-beam input during the opening cycle will cause the gate to stop. The
gate will remain stopped until the photo-beam input is cleared, at which
time the gate will resume the open cycle.
2. CLOSE PHOTO-BEAM
This input is only active when the gate is in the closing cycle. A close
photo-beam input during the
closing cycle will cause the gate to stop. The gate will- remain stopped
until the photo-beam input is cleared, at which time the gate will resume
the close cycle.
3. OPEN EDGE
This input is only active when the gate is in the opening cycle. An open
edge input during the opening cycle will cause the gate to stop and then
reverse.
a. If the the gate reaches the full closed position, the gate will remain
closed, ignore any maintained inputs and enter a soft shutdown condition
NOTE: If the gate was initially activated by a time clock with a
contact closure across the gate
operator open input, this input will be ignored until another input (open
loop, reverse loop. etc.)
is received by the gate operator.
b. If a close edge sensor is activated prior to the gate reaching the full
closed position, the gate
will stop and enter a soft shutdown condition.
4. CLOSE EDGE
This input is only active when the gate is in the closing cycle. A close
edge input during the closing
cycle will cause the gate to stop and then reverse.
a. If the gate reaches the full open position, the timer will automatically
close the gate (if it is
turned on). Once the gate starts to close again, if the close edge input is
activated a second
time prior to the gate reaching the full closed position, the operator will
stop and reverse and
will enter a soft shutdown condition.
b. If an open edge sensor is activated prior to the gate reaching the full
open position, the gate
will stop and enter a soft shutdown condition.
5. ALARM RESET
This input turns off the entrapment alarm and resets the operator after a
hard shutdown has occurred.
6. ALARM SIGNAL
This is an output from the circuit board that drives the entrapment alarm.
Do not connect any other
device to this terminal.
MAIN TERMINAL STRIP
Use terminal 12 on the main terminal strip as the common for all auxiliary
terminal inputs.
|
|

|
ADJUSTMENTS
The switch settings and adjustments in this chapter should be made after
your installation and wiring to the operator(s) is complete. Whenever any of
the programming switches on the circuit board are changed, power must be
shut-off, and then turned back on for the new setting to take effect.
SECTION 3.1
CIRCUIT BOARD ADJUSTMENTS
* Set the DIP switches on the circuit board to the desired setting. See
switch setting chart in section 3.2.
* Auto close timer (when turned on) can be set from 1 second (full counter
clockwise) to approximately 23 seconds (full clockwise).
* Dry contact relay contacts (terminals 10-11) can be set for Normally Open
(NO) or Normally Closed (NC) operation by placing the relay shorting bar on
the NO or NC pins respectively.
* Power LED indicates that low voltage power is applied to the circuit
board. The input LEDs should be OFF and will only illuminate when the input
is activated. The pulse LEDs will blink as the operator is running. They can
be either ON or OFF when the operator is stopped.
|
|
 |
|

|
SECTION 3.2 SWITCH
SETTINGS
The DIP switches located on the circuit board are used to program the
operator to operate in various modes and to turn on or off various operating
features. Typical switch settings are labeled (Typ). Whenever a switch
setting is changed, power must be turned OFF to the operator, and then
turned back on for the new setting to take affect. Check and review ALL
switch settings prior to applying power to the operator.
|
| DIP SWITCH |
| Switch |
Function |
Setting |
Description |
| 1 |
Direction |
OFF
ON |
|
Changes open / close direction of
operator. |
| 2 |
Auto Close
Timer |
OFF
ON |
(Typ) |
Auto close timer is turned OFF. Manual
input required to close gate.
Auto close timer is turned ON. |
| 3 |
Relay |
OFF
ON |
|
Relay is activated when the gate is full
open.
Relay is activated when the gate is not closed. |
| 4 |
Solenoid Lock |
OFF
ON |
(Typ)
|
Fail Safe. Lock engages only when an
attempt is made to force gate open.
Fail Secure. Lock engages after each cycle. |
| 5 & 6 |
Open Back Off |
SW5
OFF
OFF
ON
ON |
SW6
OFF
ON
OFF
ON |
Back off 0 inches from full open position (Typ).
Back off 1 inch from full open position.
Back off 2 inches from full open position.
Back off 3 inches from full open position. |
| 7 & 8 |
Close Back Off |
SW7
OFF
OFF
ON
ON |
SW8
OFF
ON
OFF
ON |
Back off 0 inches from full close position (Typ).
Back off I inch from full close position.
Back off 2 inches from full close position.
Back off 3 inches from full close position. |
|
| |
Switch 1: Sets direction of the operator so
that the operator cycles open upon initial power up and open command. If the
operator begins to cycle close upon initial power up and open command, turn
power off and change the setting on this switch.
Switch 2: Turns the auto close timer on or off. Maximum time that the close
timer can be set for is 23 seconds.
Switch 3: This switch determines when the relay on the board will be
activated. This relay can be used as a switch for various functions such as
illuminating a warning light when the gate is not closed, or turning on a
green light when the gate is full open.
Switch 4: This switch determines the operation of the solenoid lock and is
factory set. CAUTION: Do not change the setting of this switch unless the
solenoid / lock assembly has been repositioned for the operation desired.
Changing the setting of this switch without physically changing the lock
assembly will damage the operator.
Switches 5-6: These work in conjunction with each other and determine if the
operator will stop the gate at the full open position, or if the gate should
stop 1, 2 or 3 inches short of the full open position.
Switches 7-8: These work in conjunction with each other and determine if the
operator will stop the gate at the full closed position, or if the gate
should stop 1, 2 or 3 inches short of the full closed position.
|
|

|
SECTION 3.3
AUTOMATIC LIMIT ADJUSTMENT
This gate operator does not use any mechanical limit switches or run timers
to adjust the open and close positions of the gate. The gate open and close
positions are determined by the physical stops (or chain stops) of the gate.
The gate operator will automatically measure the gate and will set its
"limits" from this measurement during this automatic sequence.
!! IMPORTANT !!
This automatic limit adjustment sequence must be run prior
to testing the operator for normal operation, and prior to testing any of
the safety features that are incorporated into this operator. This includes
the primary and secondary entrapment protection features, and the entrapment
alarm and reset features.
1 . The limit adjustment is automatic and relies on the physical stop of the
gate or on the chain stops installed on the chain. Re sure that the gate has
a physical travel limitation in both directions prior to starting this
sequence. DoorKing "Gate Stops" can be used if physical stops are not
present on the gate.
2. Turn power to the operator ON. Activate an open device (or momentarily
jumper between terminals 8 and 12). The gate operator should begin to cycle
the gate to the OPEN position.
2a. If the gate operator begins to cycle the gate to the CLOSED position,
turn power to the operator OFF. Change the setting of the direction switch
1, then repeat step 2.
3. After the gate reaches the full open position, the gate operator will
shut off. Activate a keying device to close the gate (or allow the timer to
close the gate if it is turned on). When the gate reaches the full closed
position, the gate operator will shut off.
NOTE: During this initial setup, be sure that the operator clutch does not
slip while the gate is cycling from the full open to the full closed
position. If the clutch slips during this period, the limits will be
misadjusted.
4. After closing, the gate will open automatically and stop approximately
one foot from the full open position, and then will continue to the full
open position. Activate a keying device to close the gate (or allow the
timer to close it if it is turned on). The gate will close and stop
approximately one foot from the full closed position, and then will continue
to the full close position.
5. The operator limits and coast settings are now set. Cycle the gate again.
The operator should reach the full open and full close positions and then
shut off automatically.
|
|

|
SECTION 3.4 INHERENT
REVERSE ADJUSTMENT
This vehicular gate operator is equipped with an inherent (Type A)
entrapment sensing system. This system will sense an obstruction in either
the opening or closing gate cycles and will cause the gate to reverse
direction should an obstruction be encountered. For this system to function
correctly, the gate must be properly installed and work freely in both
directions. A good set of ball bearing wheels (or rollers) is essential for
proper slide gate operation.
3.4.1
REVERSE SENSITIVITY ADJUSTMENT
1 . Activate the gate operator my momentarily shorting terminal 8 and 12
with a 1 foot piece of 18 AWG wire. Be sure that the automatic limit
adjustment has been completed as described in section 3.3.
2. While the gate is running, slowly rotate the reverse sensitivity
potentiometer clockwise until the gate reverses travel, then rotate the
potentiometer 1/8 turn counter clockwise.
Note: Rotating the sensitivity adjustment clockwise INCREASES the reverse
sensitivity. Rotating this adjustment counter-clockwise DECREASES the
reverse sensitivity.
NOTE: After the gate has reversed, the operator will assume a "soft
shutdown" making it necessary to initiate the cycle again by momentarily
shorting across terminals 8 and 12 as in step 1.
3. Operate the gate a few times to be sure that it cycles completely.
4. Place a 2 x 4 piece of wood in an immobile position along the path of the
gate so that the gate will strike it while in the open cycle. The gate must
reverse direction after striking the 2 x 4. If it does not, increase the
reverse sensitivity by turning the potentiometer 1/8 turn clockwise, then
repeat this test.
NOTE: After the gate has reversed, the operator will assume a "soft
shutdown" making it necessary to initiate the cycle again by momentarily
shorting across terminals 8 and 12 as in step 1.
5. Place a 2 x 4 piece of wood in an immobile position along the path of the
gate so that the gate will strike it while in the close cycle. The gate must
reverse direction after striking the 2 x 4. If it does not, increase the
reverse sensitivity by turning the potentiometer 1/8 turn clockwise, then
repeat this test.
NOTE: After the gate has reversed, the operator will assume a "soft
shutdown" making it necessary to initiate the cycle again by momentarily
shorting across terminals 8 and 12 as in step 1 to reactivate the automatic
close timer.
6. You may have to repeat step 2 several times to find the correct
sensitivity adjustment.
|
|
 |
|

|
3.4.2
CLUTCH ADJUSTMENT
In addition to the reverse sensitivity adjustment, this operator is equipped
with a mechanical slip clutch to further reduce the possibility of injury
should an entrapment occur. Do not over tighten the clutch in this gate
operator to compensate for a damaged or poorly constructed gate, or to
compensate for a gate that is too heavy or that has damaged wheels or
rollers. Doing this can create a hazard which can result in serious injury
or death to persons who may become entrapped.
1 . Be sure power to the operator is turned OFF whenever adjustments to the
clutch are being made. Loosen the center hex lock screw to "un-lock" the
jamb nut (an allen wrench is provided in the operator), then loosen the jamb
nut. You may have to hold the large pulley to loosen this nut.
2. Tighten the jamb nut so that it is finger tight, then tighten it one turn
with a wrench. Tighten the center hex lock screw to lock the jamb nut in
place.
3. Apply power to the gate operator and cycle it to allow the operator to
adjust its limit settings as described in section 3.3.
4. Activate the gate operator by momentarily shorting across terminals 8 and
12 with a 1 foot 18 AWG
wire. When the gate begins to open, determine if the clutch is slipping. If
the clutch is slipping, turn
power OFF and tighten the jamb nut one more turn as described in step 2,
then repeat steps 3 and 4
(This process may have to be repeated several times to get the right clutch
adjustment).
5. After adjusting the clutch so that the gate opens and closes without it
slipping, place a 2 x 4 piece of wood in an immobile position along the path
of the gate so that the gate will strike it while in the open cycle. The
clutch should slip and the gate must reverse direction after striking the 2
x 4. If it does not, repeat steps 1-3, and 5 to readjust the clutch.
NOTE: After the gate has reversed, the operator will assume a "soft
shutdown" making it necessary to initiate the cycle again by momentarily
shorting across terminals 8 and 12.
6. Place a 2 x 4 in an immobile position along the path of the gate so that
the gate will strike it while in the close cycle. The gate must reverse
direction after striking the 2 x 4. If it does not, repeat steps 1-3 , and 6
to readjust the clutch.
NOTE: After the gate has reversed, the operator will assume a "soft
shutdown" making it necessary to initiate the cycle again by momentarily
shorting across terminals 8 and 12 to initiate the auto close timer.
7. The ideal clutch adjustment will allow the operator to move the gate
through its entire travel cycle without slipping, but will slip upon contact
with an obstruction with no more than 75 Lbs of force. This force can be
measured with a gate scale, DoorKing P/N 2600-225.
|
|

|
Chapter 4 - OPERATING
INFORMATION
IMPORTANT SAFETY INSTRUCTIONS
WARNING - To reduce the risk of injury or death:
1. READ AND FOLLOW ALL INSTRUCTIONS.
2. Never let children operate or play with gate controls. Keep the remote
control away from children.
3. Always keep people and objects away from gate. NO ONE SHOULD CROSS THE
PATH OF THE MOVING GATE.
4. Test the operator monthly. The gate MUST reverse on contact with a rigid
object or stop or reverse when an object activates the non-contact sensors.
After adjusting the force or the limit of travel, retest the gate operator.
Failure to adjust and retest the gate operator properly can increase the
risk of injury or death.
5. Use the emergency release only when the gate is not moving and power has
been shut-off.
6. KEEP GATES PROPERLY MAINTAINED. Read the owner's manual. Have a qualified
service person make repairs to gate hardware.
7. The entrance is for vehicles only. Pedestrians must use separate
entrance.
8. SAVE THESE INSTRUCTIONS.
|
SECTION 4.1 POWER AND
RESET SWITCHES
Open the power switch cover located on the side of the operator to access
the MAIN POWER switch and the operator RESET switch (Fig. 4.1).
The RESET switch is used to turn off the entrapment alarm and to reset the
operator after a hard shutdown has occurred.
The AC POWER toggle switch turns power to the operator ON (toggle up) or OFF
(toggle down).
|
|
 |
|

|
SECTION 4.2 SHUTDOWN
CONDITIONS
Under various entrapment conditions the operator will assume either a soft
or hard shutdown (alarm) condition. To determine what type of reset action
is required, you will need to understand how the different entrapment
conditions affect the gate operator:
4.2.1
SOFT SHUTDOWN
This occurs in various situations where the inherent or secondary entrapment
protection devices have been activated. In a soft shutdown condition, the
operator will not respond to any input that was present when the entrapment
protection device sensed an obstruction. If the gate stops at the open
position, the operator will not respond to the automatic close timer.
* Example 1: A time clock keys the gate open in the morning and an
entrapment protection device senses an obstruction prior to the gate
reaching the full open position. If the entrapment is sensed by the inherent
system, the gate will reverse and run back to the closed position. The time
clock input is still present, but the gate will not re-open.
NOTE: In some systems, the time clock input comes from the telephone entry
system relay. This same relay may also provide open commands for a card
reader, MicroPLUS transmitters and the visitor telephone entry. If so, these
devices will also be disabled in a soft shutdown condition.
* Example 2: If the gate is closing and an entrapment protection device is
activated, the gate will either stop or reverse and run back to the open
position, depending upon if the secondary or inherent device was activated.
The automatic close timer will not close the gate.
* Example 3: Vehicle arrives at open loop and gate runs towards the open
position. The inherent entrapment protection is activated. The gate reverses
and runs back to the closed position. If the vehicle is still present at the
open loop a soft shutdown condition does not occur. The loop input provides
an immediate reset of the operator and the gate will again run to the open
position.
4.2.2
RESETTING A SOFT SHUTDOWN
In some conditions, a soft shutdown will reset as soon as the entrapment
condition clears. For example, if a non-contact sensor (photo cell) is
sensing entrapment, the operator will stop the gate and assume a soft
shutdown condition. When the photocell clears, the operator will return to
normal operation.
When the operator is in a soft shutdown, activation of any "intended input"
will reset the operator. An "intended input" includes any command, any
standard safety input and any loop input. Activating any of these inputs
will reset the gate. At that point the gate will return to normal operation.
If the gate is open, the automatic close timer will then time out and close
the gate.
|
|

|
4.2.3
HARD SHUTDOWN
A hard shutdown condition occurs when the inherent entrapment protection
system has sensed two consecutive obstructions before the gate reaches the
full open or closed position.
* Example: The gate is closing and the inherent entrapment protection system
senses an obstruction and causes the gate to reverse direction. As the gate
begins to run in the open direction, a second obstruction is sensed prior to
the gate reaching the full open position. Once the second obstruction has
been sensed, the operator will stop, the audio alarm will be activated and
all standard inputs are shut down (including open commands, safety commands,
loop inputs, etc.).
NOTE: The audio alarm will remain activated for a maximum of five minutes,
or until the operator receives a reset input. The hard shutdown condition
will remain in affect even if the audio alarm shuts off after five minutes.
4.2.4
RESETTING A HARD SHUTDOWN
When the operator is in a hard shutdown condition, the only way to reset the
gate operator and return it to normal operation is to activate the alarm
reset input (auxiliary terminal 5 and main terminal12). An alarm reset
switch can be mounted external of the gate operator provided that it is
installed in the line of sight of the gate and gate operator.
NOTE: DoorKing operators have a built-in alarm reset push button mounted on
the operator above the power ON-OFF toggle switch. Activating this button
will return the gate operator to normal operation, but will not activate the
gate operator.
Once the gate has been reset, an open or close command is needed to start
the gate operator. Most activating commands will cause the gate operator to
cycle to the open position. This includes activation of a key switch or open
command and activation of an open loop. Activation of a close command will
run the gate to the closed position.
NOTE: The gate operator will not lose it's limit settings when a hard
shutdown occurs.
|
|

|
SECTION 4.3 MANUAL /
EMERGENCY VEHICLE GATE OPERATION
This operator is equipped with a manual release system that will allow the
gate to be pushed open in the event of a power outage or equipment failure.
The type of release system may be dependent on local codes, so check with
the installer to verify which system your gate operator is equipped with.
There are two manual release systems that are available on this gate
operator. The standard type release is the FAIL-SAFE system (required by
many city codes), while an optional release is the FAIL-SECURE system.
NOTE: Never attempt to manually push open any gate with an operator attached
to it until you have verified that power to the operator has been shut-off.
4.3.1
EMERGENCY VEHICLE ACCESS CONDITIONS
The automatic vehicular gate system must be designed to allow access to
emergency vehicles under different operating conditions.
1. During normal powered operation, emergency vehicles access the gate by
use of the emergency vehicle access device installed on your gate system.
The type of device that is used in your community is dependent on your local
city codes.
2. In the event of a power failure, the emergency vehicle access device may
not be functional because the gate operator is un-powered. If the gate
operator is equipped with a battery back-up system, this system will
automatically open the gate when primary (AC) power is removed.NOTE: DC
powered back-up systems are optional and your gate system may or may not be
equipped with one. Check with your installer to determine if your gate
system is equipped with a backup power system.
3. In the event of a primary (AC) power failure and a back-up system (DC)
power failure (low charged or dead batteries for example), the system must
have a release system to allow the gate to be manually operated. The release
device must be accessible from either side of the gate and must be present
so that emergency personnel can gain access through the gate under this
condition.
|
|

|
4.3.2
FAIL-SAFE RELEASE
The FAIL-SAFE release system is the most reliable and safest method for
placing an automated gate in manual operation and is the preferred method of
gate release by many Fire Chiefs and Building Inspectors and is typically
used in CLASS I and CLASS 11 applications. This system requires no keys,
cranks or tools for manual gate operation and is completely automatic. This
prevents any delays for emergency vehicle access in the event that a power
outage has occurred.
* When AC power is removed (power failure or switch power off), the operator
"FAILS" in a "SAFE" condition allowing the gate to be manually pushed open
without the need of any tools, keys, cranks or other devices. This assures
emergency vehicle access under the worst case conditions.
* For manual gate operation, turn power to the operator OFF. If a backup
power system is in use, be sure that this power is turned OFF also. Once
power is OFF, the gate can be manually operated.
* If an attempt is made to force the gate open under normal operating
conditions (AC power present), a dead bolt solenoid will automatically
engage in the gate operator to lock the gate. If Gate Trackers reporting is
in use, a forced entry attempt transaction will be sent to the DoorKing
access control system at this time.
4.3.3
FAIL-SECURE RELEASE
The FAIL-SECURE option locks the gate when primary (AC) power is removed and
requires a keyed release to place the gate in manual operation. The
FAIL-SECURE option is typically used in CLASS III and CLASS IV applications.
* Be sure that primary (AC) and backup (DC) power is removed or shut-off
prior to placing the gate operator in manual operation.
* Insert the manual release key into the keyed release on the side of the
gate operator, and turn it clockwise 1/4 turn. The gate can now be manually
operated.
|
|
 |
|

|
Chapter 5
MAINTENANCE, TROUBLE SHOOTING AND ACCESSORIES
Inspection and service of this gate operator by a qualified technician
should be performed anytime a malfunction is observed or suspected. High
cycle usage may require more frequent service checks.
SECTION 5.1
MAINTENANCE
When servicing the gate operator, always check any secondary (external)
reversing devices (loops, photo eyes, reversing edges, etc.) for proper
operation. If external reversing devices cannot be made operable, do not
place this operator in service until the malfunction can be identified and
corrected.
Always check the primary inherent reversing system when performing any
maintenance. If the inherent reversing system cannot be made operable,
remove this operator from service until the cause of the malfunction is
identified and corrected. Keeping this operator in service when the inherent
reversing system is malfunctioning creates a hazard for persons which can
result in serious injury or death should they became entrapped in the gate.
When servicing this gate operator, always turn power OFF!!
|
|
Monthly Schedule |
Interval |
| 3 |
6 |
12 |
| Alarm |
Activate the primary (inherent) reverse system by
blocking the gate with a solid object. When the gate reverses, block the
gate in the opposite direction prior to the limit being reached. The
entrapment alarm should sound. Press the reset button to silence the
alarm. |
X |
|
|
| Belt |
Check for alignment, tightness and wear. |
|
X |
|
| Chain |
Check for sagging. Tighten if necessary. |
|
X |
|
| Clutch |
Check for proper slippage when obstruction is
encountered. |
X |
|
|
| Fire Dept. |
Check emergency vehicle access device for proper
operation. |
X |
|
|
| Gate |
Inspect gate for damage. Check gate wheels, rollers and
guides for wear and grease if necessary. |
|
X |
|
| Grease |
Wheels and guide rollers. |
|
|
X |
| Loop(s) |
Check reverse loops for proper operation. |
X |
|
|
Primary (Inherent)
Reverse System |
Check that gate reverses on contact with an object in
both the opening and closing direction. |
X |
|
|
| Pulleys |
Check for alignment. Check set screws. |
|
X |
|
| Release |
Check manual release for proper operation. |
X |
|
|
Secondary
Reverse Device |
Check that secondary (external) reverse devices stop or
reverse the gate when activated. |
X |
|
|
| Complete Check |
Complete check of gate and gate operating system. |
|
|
X |
|
| |
|

|
SECTION 5.2
TROUBLE SHOOTING
Have a good VOM meter to check voltages and continuity. A Meg-Ohm meter
capable of checking up to 500 megohms of resistance is necessary to properly
check the integrity of the ground loops. When a malfunction occurs, isolate
the problem to one of three areas: 1) the operator, 2) the loop system, 3)
the keying devices. Use caution when checking high voltage wiring, the motor
capacitor and the motor.
1. Check the input indicator LEDs. They should only come ON when a keying
device (card reader, push button, etc.) is activated. If any of the input
LEDs are ON continuously, this will cause the gate operator to hold open.
Disconnect the keying devices one at a time until the LED goes OFF.
2. Check the secondary entrapment protection devices (photo-cells, reverse
edges, etc.). Any short or malfunction in these devices can cause the gate
operator to stop or to hold open. Push the RESET button to reset the gate
operator. Disconnect the secondary items one at a time until the source of
the malfunction is found and corrected.
3. A malfunction in a loop or loop detector can cause the gate operator to
hold open, or to not detect a vehicle when it is present over the loop. Pull
the loop detector circuit boards from the loop ports on the operator circuit
board. If the malfunction persist, the problem is not with the loop system.
For more information on trouble shouting loops and loop detectors, refer to
your loop detector instruction sheet and to the DoorKing Loop and Loop
Detector Information Manual.
4. Check to be sure that there are no shorted or open control wires from the
keying devices to the gate operator. If a keying device fails to open the
gate, momentarily jumper across terminals 8 and 12 on the gate operator
circuit board. If the gate operator starts, this indicates that a problem
exist with the keying device and not with the gate operator.
5. Check the high voltage supply. A voltage drop on the supply line (usually
caused by using too small supply voltage wires) will cause the operator to
malfunction. Refer to the wire size chart in section 2.2.
|
|
TROUBLE SHOOTING |
| Symptom |
Possible Solution |
Operator will not run.
Power indicator LED
on circuit board is OFF |
1 . Check that power to the operator is turned ON.
2. Check for HIGH VOLTAGE POWER at the high voltage terminals. If
voltage measures 0, check power supply to operator.
3. Check for 115 VAC at control board terminals 2 and 3. If voltage
measures 0, check wiring from high voltage terminal strip to control
board terminal strip. If voltage measures OK, check the terminal strip
or replace the circuit board.
|
Operator will not run.
Power indicator LED
on circuit board is ON |
1 . Momentarily jumper terminal 8 to terminal 12. If
input LED does not come ON, check terminal strip or replace control
board. If input LED does come on, go to step 2.
2. Be sure the chain is not too tight. A too tight chain may cause the
operator to stall.
3. Turn power switch OFF and remove control board.
4. Place a jumper wire from terminal 3 to terminal 4 (CAUTION - High
Voltage).
5. Turn power switch on. Operator should run. Turn switch off and remove
jumper.
6. Place a jumper wire from terminal 3 to terminal 5 (CAUTION - High
Voltage).
7. Turn power switch on. Operator should run. Turn switch off and remove
jumper.
8. If motor runs in both step 5 and step 7, replace the control board.
If motor does not run in step 5 and/or step 7, bad motor, motor
capacitor, motor resistors, or wiring to motor. |
| Gate opens a short distance, then stops and reverses. |
1 . Check that the clutch is adjusted properly and is
not slipping.
2. Check that the chain is not too tight and that the gate operates
freely without any binding.
3. Re-adjust the reverse sensitivity.
4. Check the counter LEDs on the control board. They should blink on and
off as the gate is moving. If the counter LEDs are not blinking, check
that the magnetic pickup transistors are within 1/8 inch of the plastic
protective cover above the magnet assembly on the output shaft.
5. Replace the board.
|
| Gate opens but will not close. |
1 . Check the input LEDs. Any ON will hold the gate open
and indicates a problem with the keying device.
2. Check secondary devices. Any that are activated can hold the gate
open.
3. Operator may be in a "soft shutdown." Activate any device to
determine if operator returns to normal operation.
4. Check the call LEDs on the loop detector boards. Any ON will hold the
gate open and indicates a problem with the loop or loop detector.
5. If automatic close is desired, check that switch 2 is ON.
6. Go to symptom 2 on preceding page to check motor.
7. Replace circuit board. |
| Gate closes but will not open. |
1 . Operator may be in a "soft shutdown." Activate a
keying device to determine if operator returns to normal operation.
Check to be sure gate operator is running in correct direction. Turn
power OFF and then back ON. Activate a keying device. Operator should
run open. If operator runs closed. turn power OFF and change direction
switch.
3. Check the input LEDs. If LED lights, but gate does not open, check
the terminal strip for good connection to circuit board.
4. Go to symptom 2 on preceding page to check motor.
5. Replace circuit board. |
| Gate starts to close, then reverses to open. |
1 . Check the gate at the point of reversal to be sure
that it is not binding on anything.
2. Check that the clutch is adjusted properly and is not slipping.
3. Re-adjust the reverse sensitivity.
4. Check input and loop detector LEDs. Any that flash ON will cause gate
to reverse travel.
5. Check the COUNTER LEDs on the circuit board.
6. Replace the circuit board. |
| Gate closes, then re-opens. |
1 . Check for any input or loop detector LEDs that are
ON.
2. Check that operator is traveling in proper direction (third symptom
above).
3. Turn power off, then back on and reset the operator limits (section
3.3). |
| Solenoid lock is not working. |
1 . If operator was order as FAIL-SECURE, check that
switch 4 is ON. If operator was ordered as FAIL-SAFE, proceed to step 2.
2. Turn power OFF and remove control board.
3. Place a jumper wire from terminal 3 to terminal 6 (CAUTION - HIGH
VOLTAGE).
4. Momentarily turn power on. If solenoid does not activate, replace
solenoid. If solenoid activates, replace control board. |
| Operator Alarm sounds for 5 minutes and then turns off.
Gate operator will not run. |
1 . Operator is in a "hard shutdown." Reset input must
be activated to return operator to normal operation. |
| Loop detector LED is on continuously. |
1 . Activate the reset switch on the loop detector.
2. Decrease loop detector sensitivity.
3. Check loop wire for resistance to ground with a meg-ohm meter.
Resistance should be 100 megohms or greater. If less than 75 megohms,
replace the loop wire.
4. Be sure that the lead-in wire from the loop is twisted at least six
turns per foot.
5. If there are any connections in the loop wire, they must be soldered.
6. Replace the loop detector board. |
| Loop detector LED never activates - loop never detects
vehicles. |
1 . Increase loop detector sensitivity.
2. Move the loop detector to the other loop port on the control board.
If loop detector operates normally, replace the control board. If loop
detector still fails, proceed to step 3.
3. Check continuity of loop wire. Resistance should be 0 ohms. If
continuity check indicates anything other than 0 ohms, check to be sure
that all connections are soldered.
4. Replace the loop wire.
5. If continuity of loop checks OK, replace the loop detector. |
| Loop detectors operate intermittently. |
1 . Check for loops in close proximity to each other. be
sure different loop
detectors are set to operate at different f reqUencies.
2. Reset loop sensitivity. |
|
| |
MOTOR / BELT ACCESS
To gain access to the inside of the gate operator, loosen the two bolts on
each side of the electrical panel at the bottom. The entire panel can then
swing up for easy access into the operator. CAUTION !! Be sure power is OFF
before accessing the inside of the operator. Be sure that the electrical
panel is secured in the up position - it will not stay in this position by
itself.
|
|

|
SECTION 5.3
ACCESSORIES
The following accessory items can be used with the model 9050 and 9070 slide
gate operators.
|
| Contact Sensor |
Contact sensors models for use as a secondary entrapment
protection device.
Miller Edge, Inc.
ME120, ME123, MG020, MGR20, MGS20
|
| Photo-Cell |
Non-contact (photo cells) sensors for use as a secondary
entrapment protection device.
EMX Industries, Inc., Model IRB-325
MMTC, Inc., Model E3K-R1OK4-NR
|
| Loop Detector |
Detectors plug directly into ports on circuit board
simplifying wiring.
P/N 9405-010 - Single channel detector
P/N 9406-010 - Two channel detector
|
| Time Clock |
7 day and 365 day time clocks can be used to
automatically open gate at pre-set time and days. Compact clock. fits
inside the operator.
P/N 2600-791 - 7 day clock P/N 2600-795 - 365 day clock
|
| Surge Devices |
High and low voltage surge suppressors help prevent
circuit board failure caused by lightning strikes and power surges.
P/N 1876-010 - High Voltage P/N 1878-010 - Low Voltage
|
| Gate Scale |
Use to test torque required to move gate.
P/N 2600-225
|
| Speed Bumps |
Prefabricated six foot speed bump reduces traffic speed
through gate system.
P/N 1610-150
|
| Endless Idler |
Use when gate operator is rear or center mounted.
P/N 2600-818
|
| Base Plate |
Required if operator is to be post mounted.
P/N 2600-418
|
| Nickel Chain |
Nickel plated chain.
P/N 2600-443 (10 ft. #4 1 ), P/N 2600-444 (10 ft. #40)
|
| Stainless Chain |
Stainless steel chain.
P/N 2600-475 (20 ft. #41) |
|
|

|
|
 |
|

|
 |
|

|
 |