Applications
Pre-Installation Checklist
Parts Identification
Operator Installation
Chain Bracket Installation
Chain & Chain Bolt Installation
Chain Magnets Installation
Gate Limit Switch Installation
Quick Release Operation
Programming Current Sensing
835/836 Control Board
Siren Connection
Radio Receiver Options
Warranty
|
|
IMPORTANT SAFETY INSTRUCTIONS
WARNING - To reduce the risk of injury or death:
- READ AND FOLLOW ALL INSTRUCTIONS.
- Installation should be performed by a
professional Installer.
- Required welding should be performed by a
qualified welder.
- Should electricity be required, use a certified
electrician only.
- Any device that requires 120 Volts AC should be
U.L. approved.
- Review with the center all safety concern
including:
- Do not operate the gate unless arm around
gate is in full view.
- Never let children operate or play with gate
controls. Keep the remote control away from children.
- Always keep People and objects away from the
gate. NO ONE SHOULD CROSS THE PATH OF THE MOVING GATE.
- Periodically test the obstruction sensitivity
to assure safe and proper operation. Do not test sensitivity by
standing between the gate and the hinge or stop post.
- Do not allow children to play with the gate
controls.
- The "CAUTION AUTOMATIC GATE" signs should be
clearly visible from both sides of the gate.
- Always insure that the gate has closed
securely before leaving area.
- Arrange with local fire and law enforcement
for emergency access.
- Use the emergency release only when the gate is
not moving.
- Use safety devices such as loop detectors, edge
switches, and beam detectors whenever Possible.
- Install control devices such as keypads far
enough away (5 feet or further) from any moving parts of the
operator and gate to prevent possible injury.
- Do not install control box where the gate can
come in contact with person using the push button on side of control
box.
- Always disconnect the battery or power source
when making adjustments or repairs to any part of the gate or
operator.
- All rollers should be covered to prevent injury.
- KEEP GATES PROPERLY MAINTAINED. Read the owner's
manual. Have a qualified service person make repairs to gate
hardware.
- The entrance is for vehicles only. Pedestrians
must use separate entrance.
Test the gate operator monthly. The gate MUST reverse
on contact with a rigid object or stop when an object activates the non
contact sensors. After adjusting the force or limit of travel, retest
the gate operator. Failure to adjust and retest the gate operator
properly can increase the risk of injury or death.
SAVE THESE INSTRUCTIONS. |
|
 |
|
APPLICATIONS
The Apollo Model 7200ETL Slide Gate Operator is designed
to handle a sides gate up to 30 feet in total length (accommodates a 26
foot drive) and 1,000 Lbs. A professional fence or gate dealer is
recommended to assure proper installation. Apollo Gate Operators are
available only through qualified dealers with an outstanding reputation
in the fence and gate industry. These dealers will be able to recommend
the proper equipment for particular applications. Apollo Gate Operators
are 12 Volt DC (Direct Current) powered. A 12 Volt marine type battery
is recommended. There are several advantages with 12 Volt DC systems:
-
Low voltage virtually eliminates risk of electrical
shock.
-
Battery powered operators provide up to 200
operations in the event of power outages.
-
The battery may be recharged with a trickle charger
or by solar energy (eliminating the need for easily trenching to
remote entrances).
If a trickle charger is used and a standard electrical
outlet is not readily available, a licensed electrician will be required
for proper electrical hook up.
The following table should be used as a guide for
capacity of operation of operators only, additional options may reduce
the daily usage. Please, note that the charge capability of solar panels
will vary with different geographical location. |
|
 |
|
 |
|
PRE-INSTALLATION CHECKLIST
The following checklist should be used before beginning
installation:
Verify that the proper operator has been selected for
this application.
Verify proper installation and operation of the gate.
-
Are all rollers covered with a protective housing?
-
Are the rollers serviceable?
-
Does the gate roll free and level?
-
Will the gate require a locking device?
-
Are the main posts sturdy enough to handle the gate
& operator?
Determine the general location of the operator, chain
brackets, and solar panel (if used).
-
Is there a suitable location for the operator?
-
Can the solar panel (it used) be mounted in an
unobstructed area facing south?
-
Will additional solar panel cable be required?
-
Is electricity available (if required)?
Consider safety and access option. Recommend if needed.
-
Will there be children or animals in the area?
-
Are safety loops, edge switches, or photo beam
detectors required?
-
How can the gate be opened in emergencies?
-
How will visitors enter and exit?
-
Will vehicles (and trailers) have sufficient room
off roadway to operate any control devices such as keypads?
|
|
 |
|
PARTS IDENTIFICATION |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
 |
|
 |
| |
|
OPERATOR INSTALLATION
STEP 1. Install two 3" dia. Posts parallel to the gate
as shown. Posts height depends on height preference of operator. |
|
 |
| STEP 2. Remove chain cover and front lid.
Mount to posts using the four supplied 3" U-bolts. |
|
 |
| STEP 3. Install
one of the gate brackets and chain bolts on right side of gate using the
supplied 2" U-bolts. Do not tighten at this time. |
|
 |
| STEP 4. Attach the
chain to the chain bolt using the master chain link. |
|
 |
| Adjust the chain bolt to allow for maximum
tightening. |
|
 |
| Note: The height of the chain bolt should
align with the bottom teeth of the idler sprockets. |
|
 |
|
 |
| STEP 5. Thread chain on the sprockets as
shown. |
|
 |
|
Chain should be level with about a 1" lag per 10 feet. |
|
 |
|
Chain should be aligned with all sprockets. |
STEP 6. (Refer at
Page 6)
- Install the other gate bracket and chain bolt on the left side
of the gate.
- Determine the required length of chain needed to attach to the
chain bolt and still allow adjustment.
- Using a chain breaking tool, remove excess chain.
- Attach chain to chain bolt.
- Tighten all chain brackets and chain bolts. Allow 1 inch of
chain lag per 10 feet of chain.
|
|
 |
| GATE LIMIT
SWITCH INSTALLATION |
| Align each magnet with the corresponding
switch on the operator for the open and closed position. Connect the
battery and test for proper open & close position.
WARNING : If further adjustment is required, always disconnect
battery prior to relocating the chain magnet.
|
|
 |
 |
Factory Hookup |
| |
| If the gate automatically opens when the Timer To Close
is on, rewire the bottom half of the connector as shown. |
 |
| STEP 7. Install chain cover. Install solar
panel or battery charger and any optional accessories. Close box. Good!
Job! |
QUICK RELEASE
OPERATION
Gate may be manually opened using the quick release.
Disconnect battery before use! |
|
 |
|
 |
| Programming Current
Sensing The 835/836 circuit boards incorporate a safety feature
that will put the operator into a hard shutdown mode if the circuit
board detects a current sense two consecutive times during a cycle. This
hard shutdown condition can only be reset by shorting the FIREBOX or UL
connectors on the left side of the circuit board to ground. If a firebox
is used in the installation, the firebox door should be opened and
closed to reset the circuit board.
The following instructions must be followed at installation for
proper safety assurance. All limits should be set before beginning this
procedure.
This new procedure applies to revision 31 or higher firmware.
1. Press and hold the LED ENABLE button for five seconds. The STOP
LED will blink indicating that the board is in learn mode.
3. Cycle gate for 3 full cycles. The STOP LED will stop blinking
indicating that the board is now ready for normal operation.
4. Test the auto reverse sensitivity to ensure maximum safety
protection. The current sensitivity adjustment pot may be adjusted to
decrease or increase sensitivity. |
|
 |
| 8. Refer to the 835/836 Operator Control
Board Manual to set other options such as program switch options and
close timer adjustments. Installation is now complete.
Note: Program switch #9 is no longer functional. |
|
 |
| RECEIVER OPTIONS
Do not confuse the receiver code switches with the red program switches
on the gate control board.
Never set all code switches to the same position. Transmitters must
match code switches for proper operation.
If power is taken directly from battery or connected as shown below,
receiver should be configured for 12VDC. |
 |
 |
 |
 |
 |
| |
LIMITED TWO-YEAR WARRANTY
Apollo Gate Operators am warranted against dialects for a period of 24
months hand the date of purchase, providing recommended installation
procedures are followed. This warranty is in lieu of all other
warranties expressed or implied (some states do not allow limitations on
how long an implied warranty lasts, so this limitation may not apply to
you) and shall be considered void if damage was due to improper
installation or use, connection to improper power source, or if damage
was caused by fire, flood, or lightning. The manufacturer will not be
responsible for any labor charges incurred in the removal or replacement
of defective parts.In case of failure, due to defective material or
workmanship during the warranty period, the defective part will be
repaired or replaced at the manufacturer's option at no charge if
returned freight prepaid. New or factory rebuilt replacements may be
used. Replacement parts are warranted for the remaining portion of the
original warranty period. The manufacturer will pay standard ground
freight on the return of repaired or replaced items in warranty.
|